Lease-Break Fee: The Re-Let Cost It Must Cover
When a tenant leaves early, the landlord faces an empty unit. A lease-break fee can compensate for that. The fee has to reflect what the landlord actually loses, or it risks being treated as a penalty.
The steps
- Estimate the vacant days before a new tenant, and daily rent.
- Add advertising, screening and cleaning costs.
- Re-let cost = vacant days × daily rent + other costs.
- Compare the fee to that cost (the cost of turnover).
A worked example
Example (illustrative arithmetic, not typical figures)
Re-letting takes 20 vacant days at $55, $1,100, plus $300 of advertising, screening and cleaning: $1,400. Every figure is a made-up round number.
| Fee charged | Fee − re-let cost ($1,400) |
|---|---|
| Half a month ($825) | −$575 (does not cover) |
| One month ($1,650) | +$250 (covers, small margin) |
| Two months ($3,300) | +$1,900 (well over actual cost) |
A fee of about a month’s rent covers a re-let cost of this size. A fee of two months is $1,900 above it, which is the sort of gap that invites a challenge.
Better leases tie the fee to the cost, or charge one to two months’ rent as a fixed sum the lease says is a reasonable estimate of loss. They also say the landlord will try to re-let. If the unit fills in a week, many states expect the tenant’s liability to shrink (the security deposit).
Making it routine
- Track actual re-let cost on past turnovers.
- Set a fee that reflects it.
- Write the fee, and the duty to try to re-let, into the lease.
- Have the clause reviewed by a landlord-tenant attorney.
Run your own numbers
Use the free BRRRR calculator below to see what a vacancy and a turnover cost a rental.