Loan Extensions on Private Money Loans: How They Work

By DeskTech HQ · · 2 min read

Rehabs and sales do not always finish on schedule. When a loan reaches maturity before the project is done, the borrower and lender have a choice: payoff, extension, or default. An extension is the middle path, and it works best when it is agreed early and written down.

How extensions usually work

  • A built-in option. Some loans let the borrower extend for a set period if conditions are met, such as no default and an extension fee paid.
  • A negotiated extension. The lender agrees to more time on terms set at that moment.
  • No extension. The loan matures and is due in full.

The first step is reading the loan documents to see which one applies (what a lender tracks after closing).

A worked example

Example (illustrative arithmetic, not market data)

Assume a $150,000 interest-only loan at 12% a year with a six-month term. The project needs three more months. The extension fee is one point, and the rate stays the same. Every figure is a made-up round number.

Cost Calculation Amount
Extension fee 1% × $150,000 $1,500
Monthly interest $150,000 × 0.12 ÷ 12 $1,500
Interest for three months 3 × $1,500 $4,500
Cost of the extension $1,500 + $4,500 $6,000

That is $6,000 ÷ $150,000 = 4% of the loan amount for three more months, on top of the cost of the original term (how to read a term sheet).

What to put in the extension agreement

  1. The new maturity date.
  2. The extension fee and when it is due.
  3. The rate during the extension.
  4. Any conditions, such as progress on the work.
  5. A statement that all other terms stay in force.
  6. Signatures from both sides, and recording if the documents require it.

For borrowers

Ask early. A request made weeks before maturity gives the lender time to review the project and the file; a request made after the date has passed is harder (the cost of extra months).

For lenders

Review the status of the project, the payment history and the property before agreeing. Apply the same process to every loan, and keep the signed agreement with the loan file (payoff statements; late fees and grace periods).

Check the loan against the deal

Every extra month comes out of the same project profit. Size the loan against the deal with the free loan sizer below.

Quick answers

What is a loan extension?

An extension gives the borrower more time before the loan matures. It is usually granted for a stated number of months and may carry a fee, a change in rate, or other conditions set out in the loan documents or a written amendment.

Does the borrower have a right to an extension?

Only if the loan documents give one. Some loans include an option to extend if conditions are met, while others leave extensions to the lender's discretion. Reading the documents before closing shows which applies.

How is an extension fee usually figured?

Often as a percentage of the loan balance, such as one point, which is 1%. One point on a $150,000 balance is $1,500. The documents or the extension agreement state the amount.

Why put an extension in writing?

A written extension states the new maturity date, the fee, the rate and any other changes. It protects both sides from disagreements about what was agreed, and it may need to be recorded or signed in a particular way.

Do the numbers in this guide apply to my loan?

No. The examples are illustrative arithmetic with round numbers, not market data. The loan documents control extension terms, and rules vary by state, so confirm what applies.