Loan Extensions on Private Money Loans: How They Work
Rehabs and sales do not always finish on schedule. When a loan reaches maturity before the project is done, the borrower and lender have a choice: payoff, extension, or default. An extension is the middle path, and it works best when it is agreed early and written down.
How extensions usually work
- A built-in option. Some loans let the borrower extend for a set period if conditions are met, such as no default and an extension fee paid.
- A negotiated extension. The lender agrees to more time on terms set at that moment.
- No extension. The loan matures and is due in full.
The first step is reading the loan documents to see which one applies (what a lender tracks after closing).
A worked example
Example (illustrative arithmetic, not market data)
Assume a $150,000 interest-only loan at 12% a year with a six-month term. The project needs three more months. The extension fee is one point, and the rate stays the same. Every figure is a made-up round number.
| Cost | Calculation | Amount |
|---|---|---|
| Extension fee | 1% × $150,000 | $1,500 |
| Monthly interest | $150,000 × 0.12 ÷ 12 | $1,500 |
| Interest for three months | 3 × $1,500 | $4,500 |
| Cost of the extension | $1,500 + $4,500 | $6,000 |
That is $6,000 ÷ $150,000 = 4% of the loan amount for three more months, on top of the cost of the original term (how to read a term sheet).
What to put in the extension agreement
- The new maturity date.
- The extension fee and when it is due.
- The rate during the extension.
- Any conditions, such as progress on the work.
- A statement that all other terms stay in force.
- Signatures from both sides, and recording if the documents require it.
For borrowers
Ask early. A request made weeks before maturity gives the lender time to review the project and the file; a request made after the date has passed is harder (the cost of extra months).
For lenders
Review the status of the project, the payment history and the property before agreeing. Apply the same process to every loan, and keep the signed agreement with the loan file (payoff statements; late fees and grace periods).
Check the loan against the deal
Every extra month comes out of the same project profit. Size the loan against the deal with the free loan sizer below.