How to Read a Fix-and-Flip Loan Term Sheet

By DeskTech HQ · · 2 min read

A term sheet is one page that decides how much a loan will cost a project. Reading it line by line, and adding up every cost for the full term, is how a borrower compares offers fairly.

The lines to find

  • Loan amount and advance. The total, and how much funds at closing versus later (LTV, LTC and ARV explained).
  • Interest rate and payment type. Often interest-only, with the balance due at maturity (how interest-only payments work).
  • Points. A fee of 1% of the loan per point, usually paid at closing.
  • Term and extensions. The number of months, and what an extension costs.
  • Other fees. Documentation, inspection, draw and wire fees, if any.
  • Late fees and default interest. What happens if a date is missed (late fees and grace periods).
  • Prepayment. Whether paying off early changes the cost.

A worked example

Example (illustrative arithmetic, not market data)

Assume a $150,000 interest-only loan at 12% a year for six months, with two points and no other fees. Every figure is a made-up round number.

Cost Calculation Amount
Points 2% × $150,000 $3,000
Monthly interest $150,000 × 0.12 ÷ 12 $1,500
Interest for six months 6 × $1,500 $9,000
Total financing cost $3,000 + $9,000 $12,000

That is $12,000 ÷ $150,000 = 8% of the loan amount over the six months. If the project runs two months longer, add 2 × $1,500 = $3,000 in interest, and the cost becomes $15,000, plus any extension fee (the cost of extra months).

Questions to ask before signing

  1. What is the full cost if the project takes two months longer than planned?
  2. Which fees are paid at closing and which are added to the balance?
  3. How and when are holdback funds released?
  4. What does an extension cost, and who has to agree to it?
  5. Which document controls if the term sheet and the loan documents differ?

Compare offers on the same basis

Put each offer into the same table: points, interest for the whole term, other fees, and the cost of a longer term. Then compare totals, not only rates (hard money versus private money loans).

Check the loan against the deal

The financing cost comes out of the same profit as every other cost on the project. Size the loan against the deal with the free loan sizer below before you accept terms.

Quick answers

What is a term sheet for a short-term loan?

A term sheet is a short summary of the main terms a lender is offering, such as the loan amount, rate, points, term and fees. It is usually not the final contract, and the loan documents control if the two differ.

What are points on a loan?

A point is a fee equal to 1% of the loan amount, usually paid at closing. Two points on a $150,000 loan is $3,000. Points are a cost of the loan on top of the interest.

What is the difference between the initial advance and the holdback?

The initial advance is the part funded at closing, often toward the purchase. The holdback is the rest, released in draws as rehab work is completed and inspected.

Why compare the total cost and not only the rate?

Two offers with the same rate can cost different amounts once points, fees and the length of the term are added. Adding every line for the whole term shows what the loan actually costs the project.

Do the numbers in this guide apply to my loan?

No. The examples are illustrative arithmetic with round numbers, not market data. Terms differ by lender and loan, and rules differ by state, so read your own documents and confirm what applies.

Keep reading

Private and hard money lending

Appraisal, BPO or AVM: How Lenders Check Value

Learn how an appraisal, a broker price opinion and an automated valuation differ, and how the value a lender uses changes the loan amount, with an example.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.