Match the Name on Every Loan Document to the ID
The note says “Jon”, the deed says “Jonathan” and the ID says “Jonathan R.” A mismatch surfaces at recording and everything is signed again. A check of every name against the ID takes three minutes. The question is how likely a name error is for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Price a name error: a redo, a re-signing and delay.
- Break-even chance = check cost ÷ redo cost.
- Verify the entity too (entity borrowers: verify the LLC and signers).
A worked example
Example (illustrative arithmetic, not predictions)
The check takes 3 minutes at $60 an hour: $3. A name error costs $300 to redo. Every figure is a made-up round number.
| Chance of a name error | Expected cost avoided (chance × $300) | Avoided − $3 |
|---|---|---|
| 0.5% | $1.50 | −$1.50 |
| 1% | $3 | $0 (break-even) |
| 3% | $9 | +$6 |
| 5% | $15 | +$12 |
The check pays at a 1% chance of a name error: $3 ÷ $300. Across many loans, it is plausible.
Put the ID next to the documents, check the first name, middle name, last name and suffix on each document and confirm how the title company wants the name to appear. Do not keep copies of ID longer than you need to.
Making it routine
- Put the ID next to the documents.
- Check first, middle, last name and suffix.
- Confirm how title wants the name to appear.
- Do not keep ID copies longer than needed.
Run your own numbers
Use the free fix-and-flip loan sizer below to see what a day of delay costs in interest.