A Standard Loan Package: The Loan Count Where It Pays
Every loan needs documents. Having an attorney draft each set from scratch costs time on every loan. Having one drafted once and reused costs more at the start and less afterward. The question is how many loans it takes for the standard package to come out ahead.
The steps
- Get the attorney’s quote to draft the standard package once.
- Estimate the attorney time to review and fill in a standard package for one loan.
- Estimate the time for custom documents on one loan.
- Compute the saving per loan and divide the package cost by it. That is the break-even loan count.
- Budget for periodic updates (document prep fee).
A worked example
Example (illustrative arithmetic, not quotes)
Drafting the package costs $3,000 once. Reviewing and filling it in takes 0.5 hours at $300: $150 a loan. Custom documents take 1.5 hours: $450 a loan. Every figure is a made-up round number.
Saving per loan: $450 − $150 = $300. Break-even: $3,000 ÷ $300 = 10 loans.
| Loans closed | Standard package ($3,000 + $150 each) | Custom documents ($450 each) | Package saves |
|---|---|---|---|
| 5 | $3,750 | $2,250 | −$1,500 |
| 10 | $4,500 | $4,500 | $0 |
| 40 | $9,000 | $18,000 | $9,000 |
At 10 loans the package has paid for itself, and at 40 it has saved $9,000. For a lender closing a handful of loans in a year, custom documents are cheaper. For one closing dozens, the package is clearly better, and it also makes loans consistent, which makes them easier to service and to explain.
The yearly cost of keeping the package current is not in the table. Laws change, and a package that is a few years old may be wrong in ways nobody notices. Plan for a review each year or two, and budget for it. A standard package also does not remove the need for judgment: a loan with unusual features may need its own attorney attention (third-party servicer or in-house).
Making it routine
- Draft the package with an attorney for each state you lend in.
- Review and update it on a set schedule.
- Use it unchanged unless an attorney approves a variation.
- Track the attorney time per loan.
Run your own numbers
Use the free fix-and-flip loan sizer below to size the loans the package will cover.