Mobile Check Deposit or a Bank Trip: The Deposits
Borrower checks still arrive by mail. A trip to the bank takes twenty minutes. Depositing by phone takes a few. Setting up mobile deposit takes time and a read of the bank’s limits. The question is how many deposits it takes to pay back.
The steps
- Price the setup: time to enroll and read the limits.
- Price the saving per deposit: minutes saved × the value of your time.
- Break-even deposits = setup cost ÷ saving per deposit.
- Compare with the checks you receive each month (payment methods: check, wire, ACH).
A worked example
Example (illustrative arithmetic, not benchmarks)
Setup costs $85 in time. A bank trip takes 20 minutes ($20) and a mobile deposit 3 minutes ($3), saving $17. Every figure is a made-up round number.
| Deposits made by phone | Time saved (deposits × $17) | Saved − $85 |
|---|---|---|
| 2 | $34 | −$51 |
| 5 | $85 | $0 (break-even) |
| 10 | $170 | +$85 |
| 20 | $340 | +$255 |
Mobile deposit pays back after 5 deposits: $85 ÷ $17. A lender who receives a few checks a month is there in the first quarter.
Check the bank’s per-check and daily limits, hold times and how long to keep the paper check. Mark it as deposited, store it securely, and then shred it. Large checks may still need a branch.
Making it routine
- Read the bank’s mobile deposit terms.
- Enroll and test with a small check.
- Mark checks as deposited and store them securely.
- Shred them after the period the bank requires.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how a late check adds interest to a loan balance.