Payment Methods: What a Check, a Wire and an ACH Cost

By DeskTech HQ · · 2 min read

A borrower can pay by check, wire or ACH transfer. To the borrower they look about the same. To the lender they are different in cost, in speed and in what happens when something goes wrong.

The steps

  1. Count your payments per year by method.
  2. Time how long each method takes to receive, deposit and record, and value the time (servicing).
  3. Add the fees your bank charges for each.
  4. Add the expected cost of returned payments: the return rate times the cost of each return.
  5. Total the cost per payment and per year, and compare it with the cost of outsourcing (servicer vs in-house).

A worked example

Example (illustrative arithmetic, not bank fees)

Your time is valued at $60 an hour. A check takes 15 minutes to receive, deposit and record; a wire takes 6 minutes; an ACH payment takes 3 minutes. Fees per payment: wire $15, ACH $0.50, check none. Returned-payment rates and costs: check 2% at $35 each, ACH 1% at $15 each, wire none. Every figure is a made-up round number.

Per payment Check Wire ACH
Handling time (at $60 an hour) $15.00 $6.00 $3.00
Bank fee $0 $15.00 $0.50
Expected returns 2% × $35 = $0.70 $0 1% × $15 = $0.15
Total $15.70 $21.00 $3.65
Over a 9-payment loan $141.30 $189.00 $32.85

A check costs $12.05 more per payment than ACH, and over 40 loans of 9 payments each, that is 360 payments and $4,338 a year. A wire is the most expensive here, because the fee outweighs the time saved, but it settles quickly and is usually the right choice for a payoff (payoff statements).

Speed has a small price too. A $1,375 payment that takes 5 days to clear costs about $2.07 in lost interest at 11% a year (about $1.24 for 3 days). It is a minor factor next to handling and returns, and not worth building a policy on.

The bigger risk is the one that does not show in the average: a returned payment on a loan that is already late. Build a procedure for it (fee schedule).

Making it routine

  1. Write the accepted payment methods and any related fees in the loan documents, with an attorney’s review.
  2. Track returns by method.
  3. Reconcile payments daily or weekly.
  4. Re-run the comparison each year using your own times and fees.

Run your own numbers

Use the free fix-and-flip loan sizer below to see the monthly payment you will be collecting.

Quick answers

Why does the payment method matter?

Each method costs a different amount of time and fees, settles at a different speed and carries a different risk that a payment is returned after you thought it was safe.

Which method has the lowest cost?

It depends on your volume and your processes. Compare your own handling time and fees; the figures in this guide are made up.

Can I require a payment method?

Often you can set it in the loan documents, but rules about electronic payments, authorizations, fees and disclosures differ by state and loan type. Talk to a qualified attorney.

What is the risk with electronic payments?

A payment can be returned for several reasons, sometimes days after it was credited, and the rules and time limits differ by payment type and account. Treat funds as final only when your bank says they are ([returned payments](/blog/returned-payments-ach-lender-steps)).

Do the numbers in this guide apply to my loans?

No. The handling times, fees and return rates are made up for the example. They are not bank fees or market data.

Keep reading

Private and hard money lending

A Standard Loan Package: The Loan Count Where It Pays

Learn how to compare the one-time cost of a standard loan document package with the per-loan cost of custom documents, and the loan count where it pays.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.