Name Each Room the Same Way on Plans, Bids and Texts
The plan says “hall bath”. The bid says “bath 2”. The crew says “the little bathroom”. Tile goes into the wrong one. A one-page list of room names used everywhere takes twelve minutes. The question is how likely wrong-room work is for the list to pay.
The steps
- Price the list: minutes × the value of your time.
- Price wrong-room work: materials and labor to redo it.
- Break-even chance = list cost ÷ redo cost.
- Share it at the kickoff (kickoff call before the first draw).
A worked example
Example (illustrative arithmetic, not predictions)
The list takes 12 minutes at $60 an hour: $12. Wrong-room work costs $400 to redo. Every figure is a made-up round number.
| Chance of wrong-room work | Expected cost avoided (chance × $400) | Avoided − $12 |
|---|---|---|
| 1.5% | $6 | −$6 |
| 3% | $12 | $0 (break-even) |
| 6% | $24 | +$12 |
| 10% | $40 | +$28 |
The list pays at a 3% chance of wrong-room work: $12 ÷ $400. On a house with several similar rooms, it is plausible.
Name rooms on a floor plan with short labels, use the same labels in bids, texts, selections and the draw schedule, and tape a copy at the entry. Keep scope and price in the agreement.
Making it routine
- Name rooms on a floor plan.
- Use the same labels in bids and texts.
- Tape a copy at the entry.
- Keep scope and price in the agreement.
Run your own numbers
Use the free holding cost calculator below to see what a day of redo delay costs on your own flip.