Kickoff Call Before the First Draw: The Odds
A first draw request often arrives with missing photos, the wrong waiver or an unclear invoice. A 45-minute call before it explains the steps. The question is how likely a bad first package has to be for the call to pay.
The steps
- Price the call: minutes × the value of your time.
- Price the rework of a bad first package: back-and-forth, delay.
- Break-even chance = call cost ÷ rework cost.
- Compare with how often first packages came back wrong (lien waivers on draws).
A worked example
Example (illustrative arithmetic, not predictions)
The call takes 45 minutes at $60 an hour: $45. Rework on a bad first package costs $120. Every figure is a made-up round number.
| Chance the first package is wrong without the call | Expected rework avoided (chance × $120) | Avoided − $45 |
|---|---|---|
| 20% | $24 | −$21 |
| 37.5% | $45 | $0 (break-even) |
| 60% | $72 | +$27 |
| 80% | $96 | +$51 |
The call pays at a 37.5% chance of a bad first package: $45 ÷ $120. For a new contractor, first packages go wrong more often than that. For one with a record, the call can be shorter.
Send a one-page list after the call so the steps are in writing. The call explains the loan documents. It does not change them (how many draw photos).
Making it routine
- Hold the call before the first draw request.
- Send the steps in writing afterward.
- Shorten the call for contractors with a record.
- Log how many first packages needed rework.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how a delayed first draw changes interest on a rehab loan.