Paying Draws by Wire or ACH: The Delay That Justifies $25

By DeskTech HQ · · 1 min read

A draw can be paid by wire, which is fast and costs about $25, or by ACH, which is cheap and slower. For a contractor waiting on payment, a day can matter. The question is how long a delay the extra fee is worth.

The steps

  1. Take the extra cost of a wire over ACH.
  2. Take the borrower’s daily carrying cost.
  3. Break-even delay = extra cost ÷ daily carry.
  4. Compare with how much slower ACH really is (payment methods and their cost).

A worked example

Example (illustrative arithmetic, not quotes)

A wire costs $25, ACH $0.50, a difference of $24.50. The borrower’s daily carry is $95. Every figure is a made-up round number.

Days ACH is slower Carry saved by the wire (days × $95) Saved − $24.50
0.1 $9.50 −$15.00
0.26 $24.50 $0 (break-even)
1 $95.00 +$70.50

The wire pays if ACH is slower by more than a quarter of a day: $24.50 ÷ $95. If ACH takes a day longer, the wire is worth it by a wide margin.

The money is not the main issue. A wire cannot easily be recalled, which is why wire fraud targets draws. Always confirm payee instructions by calling a number you already have, never one in the request. A cheaper, slower ACH with verified details is better than a fast wire to the wrong account (wire fraud prevention).

Making it routine

  1. Set the standard method and when to use the other.
  2. Verify payee details by a known channel every time.
  3. Compute the break-even delay.
  4. Record who approved each payment.

Run your own numbers

Use the free fix-and-flip loan sizer below to see what a day of delay costs a borrower.

Quick answers

What is the break-even delay?

The wire's extra fee divided by the borrower's daily carrying cost.

Is ACH always slower?

Usually by a day or more, depending on timing and the bank.

Is a wire riskier?

Wires are hard to reverse, so verify payee instructions by a known channel first.

Who pays the fee?

Set it in the loan documents.

Do the numbers in this guide apply to my loans?

No. The fees and carry are made up for the example. They are not quotes.