Put a Wifi Temperature Alarm in the Vacant Unit
The furnace quits on a January night in a vacant unit. By the time anyone visits, a pipe has burst. A wifi temperature alarm costs about twenty-five dollars and takes five minutes to set up. The question is how likely a burst pipe is for the alarm to pay.
The steps
- Price the alarm: alarm + minutes × the value of your time.
- Price a burst pipe: water damage, drying and repairs.
- Break-even chance = alarm cost ÷ burst-pipe cost.
- Weigh winterizing (winterizing a vacant flip: cost vs. a burst pipe).
A worked example
Example (illustrative arithmetic, not predictions)
The alarm costs $25 plus 5 minutes at $60 an hour ($5): $30. A burst pipe would cost $5,000 to dry and repair. Every figure is a made-up round number.
| Chance of a burst pipe in a winter | Expected cost avoided (chance × $5,000) | Avoided − $30 |
|---|---|---|
| 0.3% | $15 | −$15 |
| 0.6% | $30 | $0 (break-even) |
| 1.8% | $90 | +$60 |
| 3% | $150 | +$120 |
The alarm pays at a 0.6% chance of a burst pipe: $30 ÷ $5,000. In a cold climate with a vacant unit, it is easily exceeded.
Set the alarm at a level above freezing, test it by cooling the sensor, make sure someone can get to the house quickly and keep the heat on or winterize the plumbing. An alarm is not a substitute for either.
Making it routine
- Set the alarm above freezing.
- Test it by cooling the sensor.
- Make sure someone can get there quickly.
- Keep the heat on or winterize the plumbing.
Run your own numbers
Use the free BRRRR calculator below to see how an avoided repair affects a hold.