Annual Rental Inspections: Is $75 a Year Worth It?

By DeskTech HQ · · 2 min read

A slow leak under a sink is cheap to fix in month one and expensive to fix in month twelve. A yearly walk through a rental is a way to find such things in month one. It costs time or a fee. The question is how often it has to find something.

The steps

  1. Price an inspection: a fee or your own time.
  2. Estimate the saving from a problem caught early compared with caught late.
  3. Divide the cost by the saving. That is the break-even chance of finding such a problem.
  4. Compare it with what your inspections have found.
  5. Give proper notice every time (rental property expenses to count).

A worked example

Example (illustrative arithmetic, not quotes or statistics)

An inspection costs $75. A problem found early saves about $600 compared with finding it late. Every figure is a made-up round number.

Chance an inspection finds a problem worth catching Expected saving (× $600) Cost Net
5% $30 $75 −$45
12.5% $75 $75 $0
20% $120 $75 +$45
40% $240 $75 +$165
Break-even $75 ÷ $600 = 12.5%

If an inspection finds something worth fixing one time in eight, it pays. For older units, and for tenants who do not report small problems, the chance is likely higher than that. For a newly renovated unit with a good tenant, it is likely lower. The saving also includes things the table leaves out: a documented condition at move-out, and the chance to see how the unit is being kept.

Do it properly. Give notice as the lease and local law require, at a reasonable time, for a stated purpose. Keep the visit short and the tone respectful, and note what you saw. An inspection that feels like surveillance can cost you a good tenant, which is much more expensive than any repair (tenant turnover cost).

Making it routine

  1. Put an inspection date on the calendar each year.
  2. Give written notice as the law requires.
  3. Use the same short checklist every time.
  4. Record what you find and what it saved.

Run your own numbers

Use the free BRRRR calculator below to see how a yearly repair cost changes a rental’s cash flow.

Quick answers

Why inspect a rental every year?

Small problems found early, such as a slow leak or a failing part, cost less to fix than the same problems found late.

How do I decide whether it is worth it?

Divide the cost of an inspection by the saving from a problem caught early. The result is how often it must find one to pay.

Can I enter whenever I like?

No. Rules on entry, notice and reasons differ by state and city. Follow the lease and local law, and give proper notice.

Who should inspect?

You, a property manager or an inspector. Compare the cost of each.

Do the numbers in this guide apply to my rentals?

No. The fee, odds and savings are made up for the example. They are not quotes or statistics.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.