Put the Final Walkthrough Date on the Calendar at the Start
The rehab is nearly done, but nobody scheduled the final walkthrough, so the punch list starts a week later than it could. Putting a target date on the calendar when the rehab starts takes three minutes. The question is how likely a late walkthrough is for the step to pay.
The steps
- Price the step: minutes × the value of your time.
- Price a late walkthrough: days of carry while punch items wait to be found.
- Break-even chance = step cost ÷ delay cost.
- Plan the final draw too (a written final draw checklist).
A worked example
Example (illustrative arithmetic, not predictions)
The step takes 3 minutes at $60 an hour: $3. A late walkthrough costs $300 in carry. Every figure is a made-up round number.
| Chance of a late walkthrough | Expected cost avoided (chance × $300) | Avoided − $3 |
|---|---|---|
| 0.5% | $1.50 | −$1.50 |
| 1% | $3 | $0 (break-even) |
| 3% | $9 | +$6 |
| 5% | $15 | +$12 |
The step pays at a 1% chance of a late walkthrough: $3 ÷ $300. On a flip with a tight schedule, it is easily exceeded.
Put a target date on the calendar with a reminder two weeks before, tell the contractor and move it if the schedule moves.
Making it routine
- Put a target date on the calendar at the start.
- Set a reminder two weeks before.
- Tell the contractor.
- Move it if the schedule moves.
Run your own numbers
Use the free holding cost calculator below to see what a late week costs on your own flip.