Write the Permit Expiration Date on the Project Calendar

By DeskTech HQ · · 1 min read

A permit issued in January runs out in July, and the job is still going. Nobody noticed until the inspector did. Reading the permit and putting the expiry date on the calendar takes three minutes. The question is how likely an expired permit is for the step to pay.

The steps

  1. Price the step: minutes × the value of your time.
  2. Price an expired permit: renewal fees, re-inspection and days of stopped work.
  3. Break-even chance = step cost ÷ permit cost.
  4. Know the inspections too (which inspections each permit needs and when).

A worked example

Example (illustrative arithmetic, not predictions)

The step takes 3 minutes at $60 an hour: $3. An expired permit costs $600. Every figure is a made-up round number.

Chance of an expired permit Expected cost avoided (chance × $600) Avoided − $3
0.25% $1.50 −$1.50
0.5% $3 $0 (break-even)
1.5% $9 +$6
3% $18 +$15

The step pays at a 0.5% chance of an expired permit: $3 ÷ $600. On a rehab that runs long, it is easily exceeded.

Read each permit for its expiry, put the date and a reminder on the calendar and ask the building department about renewal rules.

Making it routine

  1. Read each permit for its expiry.
  2. Put the date and a reminder on the calendar.
  3. Ask the building department about renewal rules.
  4. Renew early if the job runs long.

Run your own numbers

Use the free holding cost calculator below to see what a stalled week costs on your own flip.

Quick answers

What goes on the calendar?

The date each permit expires or needs renewal, with a reminder before it.

How do I price it?

The minutes to read the permit and add the dates times the value of your time.

What does an expired permit cost?

Renewal fees, re-inspection and days of stopped work.

What is the break-even chance?

The step's cost divided by that cost.

Do the numbers in this guide apply to my flip?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Flip project management

Ask for a Photo of Each Delivered Material Pallet

Learn how to price asking the contractor for a photo of each delivered material pallet and find the short-shipment chance at which two minutes pays.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.