Put the Roof and HVAC Replacement Years on the Unit Sheet

By DeskTech HQ · · 1 min read

The furnace fails in January and nobody knows how old it is. The reserve was built on a guess. Writing the years of the last roof and HVAC replacement on the unit sheet takes three minutes. The question is how likely a surprise replacement is for the step to pay.

The steps

  1. Price the step: minutes × the value of your time.
  2. Price a surprise replacement: an unplanned replacement the reserve did not cover.
  3. Break-even chance = step cost ÷ replacement cost.
  4. Check the insurer’s view too (get an insurance quote for the actual roof and HVAC ages).

A worked example

Example (illustrative arithmetic, not predictions)

The step takes 3 minutes at $60 an hour: $3. A surprise replacement adds $750 to the shortfall. Every figure is a made-up round number.

Chance of a surprise replacement Expected cost avoided (chance × $750) Avoided − $3
0.2% $1.50 −$1.50
0.4% $3 $0 (break-even)
1.2% $9 +$6
2% $15 +$12

The step pays at a 0.4% chance of a surprise replacement: $3 ÷ $750. With older systems, it is easily exceeded.

Find the years from permits, labels and the seller, write them on the unit sheet and set the reserve by them.

Making it routine

  1. Find the years from permits, labels and the seller.
  2. Write them on the unit sheet.
  3. Set the reserve by them.
  4. Have an inspector check the systems.

Run your own numbers

Use the free BRRRR calculator below to see how a larger reserve affects your returns on a hold.

Quick answers

What do you put on the sheet?

The year the roof and the HVAC were last replaced, or the best estimate.

How do I price it?

The minutes to find and write the years times the value of your time.

What does a surprise replacement cost?

An unplanned replacement the reserve did not cover.

What is the break-even chance?

The step's cost divided by that cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.