Get an Insurance Quote for the Actual Roof and HVAC Ages
The roof is twenty-two years old. The first quote comes back double what the seller’s bill suggested, and one insurer will not write the policy. A quote with the real roof and HVAC ages before you offer takes fifteen minutes. The question is how likely a premium surprise is for the quote to pay.
The steps
- Price the quote: minutes × the value of your time.
- Price a premium surprise: a higher premium or a roof you must replace.
- Break-even chance = quote cost ÷ surprise cost.
- Check the flood zone too (flood zone insurance cost before you offer).
A worked example
Example (illustrative arithmetic, not predictions)
The quote takes 15 minutes at $60 an hour: $15. A premium surprise costs $1,500 over a hold. Every figure is a made-up round number.
| Chance of a premium surprise | Expected cost avoided (chance × $1,500) | Avoided − $15 |
|---|---|---|
| 0.5% | $7.50 | −$7.50 |
| 1% | $15 | $0 (break-even) |
| 3% | $45 | +$30 |
| 6% | $90 | +$75 |
The quote pays at a 1% chance of a premium surprise: $15 ÷ $1,500. For an older roof or heating system, it is easily exceeded.
Ask an agent for a quote using the real roof and system ages, ask what they require and what a replacement would change, and keep the quote with your analysis.
Making it routine
- Ask an agent for a quote with the real ages.
- Ask what they require.
- Ask what a replacement would change.
- Keep the quote with your analysis.
Run your own numbers
Use the free MAO calculator below to see how a higher premium changes the most you can offer.