Quartz or Laminate Countertops: The Lift That Covers It
Countertops are what a buyer sees in the kitchen. Quartz costs more than laminate, and the question is not which is nicer but how much more the house has to sell for to cover the difference.
The steps
- Get the installed price of each option for the same kitchen.
- Extra cost = quartz − laminate.
- Price lift needed = extra cost ÷ expected sale price.
- Check whether comparables at your price show a lift that large (the cabinets question).
A worked example
Example (illustrative arithmetic, not valuations or quotes)
Quartz costs $3,800 installed. Laminate costs $1,100. The extra is $2,700. The expected sale price is $280,000. Every figure is a made-up round number.
| Price lift from quartz | Added sale price | Added price − $2,700 |
|---|---|---|
| 0.5% | $1,400 | −$1,300 |
| 0.96% | $2,700 | $0 (break-even) |
| 2% | $5,600 | +$2,900 |
Quartz must lift the price by about one percent: $2,700 ÷ $280,000. In a neighborhood where every comparable has stone counters, laminate may cost more than that in lost offers. In a lower-priced one, buyers may not care, and laminate saves the money.
Lead time counts too. A custom stone top is templated and fabricated after the cabinets are in, which can add a week or more of carrying cost (finding the price ceiling for your street).
Making it routine
- Look at the kitchens in sold comparables.
- Get both prices on the same layout.
- Compute the lift needed.
- Upgrade only where comparables back it.
Run your own numbers
Use the free MAO calculator below to see how a rehab cost changes the maximum you should offer.