Re-Run the Judgment Search at Maturity: The Odds
A judgment search at origination shows what was on the record then. A year later, a judgment, a tax lien or a contractor claim may have been filed against the borrower. A second search at maturity costs about the same as the first. The question is how likely a new claim has to be for the search to pay.
The steps
- Note the search fee.
- Estimate the loss if a new claim were missed at an extension or payoff: a priority problem or a weaker position.
- Break-even chance = fee ÷ loss.
- Compare with how long the loan ran and how active the borrower is (judgment and lien searches at origination).
A worked example
Example (illustrative arithmetic, not predictions)
The search costs $25. A missed new claim would cost $5,000 at an extension or a default. Every figure is a made-up round number.
| Chance a new claim has been filed | Expected loss avoided (chance × $5,000) | Avoided − $25 |
|---|---|---|
| 0.25% | $12.50 | −$12.50 |
| 0.5% | $25.00 | $0 (break-even) |
| 2% | $100.00 | +$75.00 |
| 4% | $200.00 | +$175.00 |
The search pays at a 0.5% chance of a new claim: $25 ÷ $5,000. For a borrower running several projects, the chance is likely higher.
The search matters most before an extension, when you are deciding whether to lend longer, and before a payoff, when a new lien could affect the property. A short loan with a clean borrower may not need it, so use your own history to decide (the extension photo check).
Making it routine
- Search again at maturity or before an extension.
- Compare with the first search.
- Record the date and the result.
- Take advice on anything new that you find.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how a longer term changes the exposure on a loan.