Record the Borrower's Contact Preference in the Loan File

By DeskTech HQ · · 1 min read

A reminder goes to an email the borrower rarely checks. A phone call would have worked. Asking at closing how they want to be reached and recording it takes two minutes. The question is how likely a missed notice is, over the life of a loan, for the entry to pay.

The steps

  1. Price the entry: minutes × the value of your time.
  2. Price a missed notice: time re-sending and chasing a notice that did not land.
  3. Break-even chance = entry cost ÷ missed-notice cost.
  4. Keep the same for investors (record each investor’s preferred contact method).

A worked example

Example (illustrative arithmetic, not predictions)

The entry takes 2 minutes at $60 an hour: $2. A missed notice costs $400 to re-send and chase. Every figure is a made-up round number.

Chance of a missed notice over the life of a loan Expected cost avoided (chance × $400) Avoided − $2
0.25% $1 −$1
0.5% $2 $0 (break-even)
1.5% $6 +$4
3% $12 +$10

The entry pays at a 0.5% chance of a missed notice: $2 ÷ $400. Over a loan with several notices, it is easily exceeded.

Ask at closing how the borrower wants to be reached, record it in the loan file and still deliver required notices as the loan documents say.

Making it routine

  1. Ask at closing how the borrower wants to be reached.
  2. Record it in the loan file.
  3. Still deliver required notices as the documents say.
  4. Confirm it each year.

Run your own numbers

Use the free fix-and-flip loan sizer below to have the loan figures at hand for every borrower call.

Quick answers

What do you record?

How the borrower wants to be reached, such as email, text or phone, and when.

How do I price it?

The minutes to ask and record it times the value of your time.

What does a missed notice cost?

Time re-sending and chasing a notice that did not land.

What is the break-even chance?

The entry's cost divided by that cost.

Do the numbers in this guide apply to my loans?

No. The time, costs and odds are made up for the example. They are not predictions.

Keep reading

Loan servicing

Keep a One-Line Reason for Every Loan Extension

Learn how to price keeping a one-line reason for every loan extension in the loan file and find the why-did-we-extend chance at which two minutes pays.

· 1 min read
Loan servicing

Annual Borrower Contact Update: The Odds That Pay

Learn how to price a ten-minute yearly check of each borrower's phone, email and address and find the chance of lost contact that makes it pay for itself.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.