Record the Date and Method of Every Notice in One Log

By DeskTech HQ · · 1 min read

A borrower says they never got the late notice. You believe you sent it, but you cannot say when or how. A single log with the date and method takes a minute per notice. The question is how likely a did-you-send-it dispute is for the entry to pay.

The steps

  1. Price the entry: minutes × the value of your time, per notice.
  2. Price a did-you-send-it dispute: time reconstructing and sometimes a re-sent notice.
  3. Break-even chance = entry cost ÷ dispute cost.
  4. Weigh certified mail too (certified mail on a default notice).

A worked example

Example (illustrative arithmetic, not predictions)

The entry takes 1 minute at $60 an hour: $1. A did-you-send-it dispute costs $100. Every figure is a made-up round number.

Chance of a did-you-send-it dispute Expected cost avoided (chance × $100) Avoided − $1
0.5% $0.50 −$0.50
1% $1 $0 (break-even)
3% $3 +$2
5% $5 +$4

The entry pays at a 1% chance of a did-you-send-it dispute: $1 ÷ $100. With many notices, it is plausible.

Write the borrower, the notice, the date, the method and the tracking number in one place the moment you send it, and keep a copy of what was sent. Send notices the way the documents require.

Making it routine

  1. Log the borrower, notice, date and method at the moment you send it.
  2. Add the tracking number.
  3. Keep a copy of what was sent.
  4. Send notices the way the documents require.

Run your own numbers

Use the free fix-and-flip loan sizer below to have the loan figures at hand when you send a notice.

Quick answers

What goes in the log?

The borrower, the notice, the date, the method and where a copy is kept.

How do I price it?

The minutes per notice times the value of your time.

What does a did-you-send-it dispute cost?

Time reconstructing what was sent, and sometimes a notice that must be sent again.

What is the break-even chance?

The entry's cost divided by that cost.

Do the numbers in this guide apply to my loans?

No. The time, costs and odds are made up for the example. They are not predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.