Rental Capex Reserve: Pricing Roof and HVAC by Age

By DeskTech HQ · · 2 min read

Two rentals can have the same rent and the same expenses, and one of them can still be a bad deal. The difference is whether the roof was replaced last year or is due next year.

The steps

  1. List the big systems: roof, heating and cooling, water heater, and any others that matter.
  2. For each, record the replacement cost and the remaining life in years (walkthrough checklist).
  3. Divide the cost by the remaining months to get the monthly reserve.
  4. Add them up and compare the total with a flat percent of rent.
  5. Subtract the reserve from your cash flow (rental expenses).

A worked example

Example (illustrative arithmetic, not market data)

Rent $1,900 a month. Cash flow before any reserve is $700 a month. The roof costs $12,000 with 5 years left, the HVAC $8,500 with 3 years left, and the water heater $1,400 with 2 years left. A comparison property has the same systems brand new, with full lives of 25, 15 and 12 years. Every figure is a made-up round number.

System Cost Reserve with old systems (remaining life) Reserve with new systems (full life)
Roof $12,000 $200.00 $40.00
HVAC $8,500 $236.11 $47.22
Water heater $1,400 $58.33 $9.72
Total per month $494.44 $96.94

A flat 5% of rent is $95 a month. That is close to the new-system case, and about a fifth of what the old systems need. Cash flow after reserve is $700 − $494.44 = $205.56 with the old systems, against $700 − $95 = $605 on the flat rule. The reserve gap is $5,933 a year against $1,140 (cash left in the deal).

The old systems are not a reason to pass. They are a reason to price the property with the replacements in mind: negotiate the price, plan to replace one system during the rehab, or accept lower cash flow for a few years (rental cash flow stress test).

Making it routine

  1. Record the age and remaining life of each system before you offer.
  2. Add the reserve to the deal sheet as its own line.
  3. Keep the reserve money separate from profit.
  4. Update the estimates each year.

Run your own numbers

Use the free BRRRR calculator below to include a capital reserve in your rental cash flow.

Quick answers

What is a capital reserve?

Money set aside each month for big replacements, such as a roof, heating and cooling system or water heater, so the cost does not arrive as a surprise.

Why not just use a percent of rent?

A flat percent assumes the systems are mid-life. A property with old systems needs far more per month, because the bill is closer. The age of each system decides how much.

How do I find the age and remaining life of a system?

Look for dates on the equipment, ask the seller for records, and get an inspector or a contractor to estimate the remaining life. Treat any estimate as a range.

Does the reserve need to be a separate account?

It helps, because it keeps the money from being spent as profit. Where you hold it is your decision.

Do the numbers in this guide apply to my property?

No. The costs, lifespans, ages and rent are made up for the example. They are not market data or advice about any property.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.