Pre-Offer Walk-Through: What an Investor Should Check
A walk-through before an offer is a chance to turn a house into a list of costs. Most of the money in a rehab hides in a few systems, and the ages of those systems are the clue.
What to check
- Roof. Age, missing or curling shingles, signs of leaks inside.
- Foundation and structure. Cracks, sloping floors, sticking doors.
- Heating and cooling. Age on the nameplate and whether they run.
- Electrical. Panel type and age, visible wiring problems.
- Plumbing. Pipe material, leaks, water pressure.
- Water heater. Age on the label.
- Other. Windows, drainage, signs of water or pests.
A worked example
Example (illustrative arithmetic, not market data)
Assume a $120,000 purchase and the findings below. Ages, typical lives and replacement costs are made up round numbers.
| System | Age / typical life | Status | Likely cost |
|---|---|---|---|
| Roof | 22 / 25 years | near the end of its life | $9,000 |
| Heating and cooling | 15 / 18 years | near the end | $6,500 |
| Water heater | 12 / 12 years | at the end | $1,200 |
| Plumbing | galvanized pipe | replace | $4,800 |
| Electrical panel | fine | none | $0 |
| Foundation | one hairline crack | bring in an engineer | not priced yet |
| Total flagged | sum | $21,500 |
The flagged systems add up to $21,500, which is 17.9% of the $120,000 purchase price. That is $21,500 the budget needs before cosmetic work, and it is a reason to check the offer price (rehab estimates; the 70% rule).
The foundation is the open item. An unpriced structural question can swing a deal by more than all the priced items, so it gets a professional before the offer is final.
Use the findings
- Put each flagged system in the rehab budget with a contractor’s price.
- Add a contingency for what you could not see (cash reserve).
- Adjust the offer or ask for a credit.
- Add permit and inspection time (permits and inspections).
- Keep photos and notes in the project file (flip project checklist).
Run your own numbers
Use the free maximum allowable offer calculator below to see how the repair total changes what you can pay.