Snow Removal: Seasonal Contract vs Per Visit

By DeskTech HQ · · 1 min read

A property with snow on the walk needs it cleared, whether it is a flip waiting to sell or a rental with tenants. A seasonal contract costs a fixed amount. Per-visit pricing costs more each time but nothing when it does not snow. The break-even is the number of visits.

The steps

  1. Get the seasonal price and the per-visit price.
  2. Break-even visits = seasonal price ÷ per-visit price.
  3. Compare with the number of events in a typical winter where the property is.

A worked example

Example (illustrative arithmetic, not quotes)

The seasonal contract is $400. A visit costs $75. Every price is a made-up round number.

Snow events this winter Per-visit total (visits × $75) Contract − per visit
3 $225 +$175 (per visit cheaper)
5.3 $400 $0 (break-even)
8 $600 −$200 (contract cheaper)

The contract wins after about five and a third events: $400 ÷ $75. In a light winter you pay for service you did not use. In a heavy one, you save.

Check what the contract promises. A vendor who is slow to arrive, or who clears only after the snow has stopped, leaves the owner exposed in the meantime. Trigger depth and response time matter as much as the price (visiting a vacant flip).

For a rental, consider who does the work now and whether the lease puts it on the tenant (manager cost vs self-managing).

Making it routine

  1. Look up how many events a typical winter brings.
  2. Get both prices in writing.
  3. Compute the break-even visits.
  4. Read liability and response terms.

Run your own numbers

Use the free holding cost calculator below to see what a winter of carrying costs adds up to on a flip.

Quick answers

How do I find the break-even number of visits?

Divide the seasonal price by the per-visit price.

Do I need to clear snow at all?

Local rules and liability often require it. Check them.

What if the season is light?

Per-visit pricing wins. A heavy season favors the contract.

What else is in the contract?

Trigger depth, response time and who is liable for a fall. Read it.

Do the numbers in this guide apply to my property?

No. The prices are made up for the example. They are not quotes.

Keep reading

Flip project management

Ask for a Photo of Each Delivered Material Pallet

Learn how to price asking the contractor for a photo of each delivered material pallet and find the short-shipment chance at which two minutes pays.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.