Visiting a Vacant Flip: Once a Week or Twice?
A vacant flip can develop problems between visits: a leak, a break-in, a door left open. The longer a problem runs, the more it costs. An extra visit a week costs time and finds problems sooner. The question is how often a problem has to start for the extra visit to pay.
The steps
- Value the time of one visit, including travel.
- Compute the average time a problem runs before discovery: half the interval between visits.
- Estimate how fast the damage grows per day.
- Compute the saving from the shorter average discovery time.
- Divide the extra visit’s cost by that saving. That is the break-even chance of a problem each week (insuring a vacant flip).
A worked example
Example (illustrative arithmetic, not statistics)
A visit takes 30 minutes at $60 an hour: $30. With one visit a week, a problem that starts at a random time runs 3.5 days on average before it is found. With two visits a week, the interval is 3.5 days and the average is 1.75 days. The saving is 1.75 days. Damage grows about $200 a day. Saving per incident: 1.75 × $200 = $350. Every figure is a made-up round number.
| Chance a problem starts in a given week | Expected saving (× $350) | Extra visit | Net |
|---|---|---|---|
| 2% | $7 | $30 | −$23 |
| 8.6% | $30 | $30 | $0 |
| 20% | $70 | $30 | +$40 |
| Break-even | $30 ÷ $350 = 8.6% |
An extra weekly visit pays if there is about a one-in-twelve chance of a problem starting in a week. For a house with new plumbing, open walls or a history of break-ins in the area, the chance is likely higher than that. For a house with water off and a locked door in a quiet street, it is lower.
There are cheaper ways to watch. A leak sensor with an alert costs little and can catch the most expensive kind of problem within minutes. A contractor on site most days is a regular set of eyes. Check your insurance too: policies for vacant properties often set conditions, such as inspection frequency, and a claim can be denied if they are not met (winterizing a vacant flip).
Making it routine
- Set the visit frequency by risk, not habit.
- Use sensors where a leak would be costly.
- Log each visit with the date and what you saw.
- Check the inspection conditions in your policy.
Run your own numbers
Use the free holding cost calculator below to see what a day of delay from a loss costs.