Structural Engineer Opinion: The Foundation Odds

By DeskTech HQ · · 1 min read

A crack in a foundation can be nothing or the biggest cost in the deal. An inspector can point it out, but cannot say what it means. A structural engineer can. The question is how likely a serious problem has to be for the fee to pay.

The steps

  1. Take the engineer’s fee.
  2. Estimate the cost of a serious foundation repair.
  3. Break-even chance = fee ÷ repair cost.
  4. Compare with how worrying the sign looks (the drainage question).

A worked example

Example (illustrative arithmetic, not predictions)

The engineer charges $500. A serious foundation repair would cost $25,000. Every figure is a made-up round number.

Chance the problem is serious Expected cost of surprise (chance × $25,000) Surprise − $500
1% $250 −$250
2% $500 $0 (break-even)
10% $2,500 +$2,000

The opinion pays at a 2% chance: $500 ÷ $25,000. A flagged crack puts the chance well above that.

The opinion helps either way. A good report can cut a price quoted in fear. A bad one can save a deal that would have lost its profit, and a written scope of repair tells you what to price (a sewer scope before an offer).

Making it routine

  1. Ask the inspector whether anything needs an engineer.
  2. Hire a licensed structural engineer, not a contractor selling a fix.
  3. Compute the break-even chance.
  4. Use the report in your offer and your disclosure.

Run your own numbers

Use the free holding cost calculator below to see what a structural delay costs each day.

Quick answers

What is the break-even chance?

The engineer's fee divided by the foundation repair cost it could uncover or rule out.

When should I get one?

When an inspector flags a crack, settlement or sloping floor.

What do I get?

A licensed engineer's written opinion on cause and fix.

Must I disclose it?

Known structural issues may need disclosure. Rules vary by state.

Do the numbers in this guide apply to my property?

No. The fee, cost and odds are made up for the example. They are not predictions.

Keep reading

Flip project management

Drainage Fix Before Listing: The Inspection Odds

Learn how to find the chance a buyer's inspector flags a water problem that makes fixing the drainage before listing cheaper than a price concession.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.