Tell the Tenant Where the Main Water Shutoff Is

By DeskTech HQ · · 1 min read

A supply line fails at night and the tenant cannot find the shutoff while water runs. A line in the welcome message saying where it is and which way to turn it takes three minutes to add. The question is how likely an avoidable flood is for the line to pay.

The steps

  1. Price the line: minutes × the value of your time.
  2. Price an avoidable flood: extra damage while nobody could find the shutoff.
  3. Break-even chance = line cost ÷ flood cost.
  4. Test the valves too (exercise the shutoff valves at turnover).

A worked example

Example (illustrative arithmetic, not predictions)

The line takes 3 minutes at $60 an hour: $3. An avoidable flood adds $1,500 in damage. Every figure is a made-up round number.

Chance of an avoidable flood Expected cost avoided (chance × $1,500) Avoided − $3
0.1% $1.50 −$1.50
0.2% $3 $0 (break-even)
0.6% $9 +$6
1% $15 +$12

The line pays at a 0.2% chance of an avoidable flood: $3 ÷ $1,500. Over several tenants and years, it is easily exceeded.

Find the shutoff, test it, say where it is and which way it turns, and add a photo with the location marked.

Making it routine

  1. Find the shutoff and test it.
  2. Say where it is and which way it turns.
  3. Add a photo with the location marked.
  4. Tell the tenant to call you after shutting it off.

Run your own numbers

Use the free BRRRR calculator below to see how an avoided repair affects your returns on a hold.

Quick answers

What do you tell them?

Where the main shutoff is and which way to turn it.

How do I price it?

The minutes to add it to the welcome message times the value of your time.

What does an avoidable flood cost?

The extra damage while water ran because nobody could find the shutoff.

What is the break-even chance?

The line's cost divided by that cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

BRRRR

Tell the Tenant How to Reset the GFCI Outlet

Learn how to price telling the tenant how to reset the GFCI outlet in the welcome message and find the dead-outlet service call chance at which it pays.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.