Termite Inspection Before an Offer: The 2% Test
Wood-destroying insects do damage that a walkthrough does not show. A termite inspection is cheap compared to the repair. The question is how likely damage has to be to justify the fee.
The steps
- Get the inspection fee.
- Estimate the cost of damage and treatment if it is found.
- Break-even chance = fee ÷ damage cost.
- Compare with the age, region and look of the property (mold testing before an offer).
A worked example
Example (illustrative arithmetic, not predictions)
The inspection costs $100. Damage and treatment would cost $5,000. Every figure is a made-up round number.
| Chance of damage | Expected cost avoided (chance × $5,000) | Avoided − $100 |
|---|---|---|
| 1% | $50 | −$50 |
| 2% | $100 | $0 (break-even) |
| 4% | $200 | +$100 |
| 8% | $400 | +$300 |
The test is two percent: $100 ÷ $5,000. In regions where termites are common, and in older wood-framed houses, the chance is above it, and the inspection is cheap insurance. In a new slab-built house in a cold region, it may not be.
Use the result to adjust the offer, or to walk away, before you close (the septic question).
Making it routine
- Ask for any past treatment records.
- Compute the break-even chance.
- Order the inspection when the odds clear it.
- Use the report in your offer.
Run your own numbers
Use the free MAO calculator below to see how a repair cost changes the maximum you should offer.