Third-Party Draw Disbursement: The Draw Count That Pays
A lender can pay out draws from its own account or hire an outside agent to do it. The agent charges a setup fee and a fee per draw. In-house costs staff time. The question is how many draws it takes for the agent to be the cheaper route.
The steps
- Cost one draw in-house: staff time and bank fees.
- Cost one draw with the agent: its fee per draw.
- Saving per draw = in-house − agent.
- Break-even draws = agent setup per year ÷ saving per draw (dual approval controls).
A worked example
Example (illustrative arithmetic, not quotes)
In-house costs $45 a draw. The agent charges $35 a draw plus $600 a year. Every figure is a made-up round number.
| Draws a year | Savings (draws × $10) | Savings − $600 setup |
|---|---|---|
| 30 | $300 | −$300 |
| 60 | $600 | $0 (break-even) |
| 120 | $1,200 | +$600 |
The agent pays at sixty draws a year: $600 ÷ $10. A book with a dozen active rehab loans, each drawing five times a year, reaches it. A small book does not.
Cost is not the only reason. An outside agent separates the person who approves a draw from the person who pays it, which is one of the better controls against error and fraud. Some lenders hire an agent for that reason even below the break-even (draw inspections).
Making it routine
- Count draws a year.
- Get the agent’s fees in writing.
- Compute the break-even draw count.
- Check that the loan documents allow it.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how the draw schedule fits the loan.