Trim Branches Off the Roof and Gutters: The Storm Odds
Branches that touch the roof scrape the shingles, clog the gutters and become limbs on the roof in the next storm. A trim every few years costs a fraction of a repair. The question is how likely storm or clog damage is, over the trim’s life, for the trim to pay.
The steps
- Price the trim: the fee or your time.
- Price the damage a storm or clogged gutter would cause.
- Break-even chance = trim cost ÷ damage avoided.
- Compare with the age of the roof (roof repair, overlay or replace).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The trim costs $60. A storm or clog repair would cost $1,500. Every figure is a made-up round number.
| Chance of damage the trim would prevent | Expected damage avoided (chance × $1,500) | Avoided − $60 |
|---|---|---|
| 2% | $30 | −$30 |
| 4% | $60 | $0 (break-even) |
| 8% | $120 | +$60 |
| 15% | $225 | +$165 |
The trim pays at a 4% chance of damage: $60 ÷ $1,500. On a house with large trees over the roof in storm country, the chance is higher.
Look at the roof from the street and the yard at turnover. Branches within a few feet of the roof, over the gutters or near the wires are the ones to trim. Hire a licensed and insured tree service for anything high or near power lines, and check who owns any boundary tree.
Making it routine
- Look at the roof from the street and the yard.
- Note branches that touch or overhang it.
- Hire a licensed, insured service for high work.
- Check ownership of boundary trees.
Run your own numbers
Use the free BRRRR calculator below to see how a roof repair changes a rental’s yearly cash flow.