Utilities in the Rent or Billed Separately?

By DeskTech HQ · · 2 min read

A landlord can include water, sewer and trash in the rent, or leave the tenant to pay them. Included utilities often rent a little easier. They also make the landlord the one who pays when the bill is high. The question is where the two options meet.

The steps

  1. Set the rent you would ask with utilities included and the rent without.
  2. Subtract. The difference is the monthly bill at which the two options leave you the same.
  3. Look at a year or more of actual bills for the unit, and their range (estimating rent with comps).
  4. Compare the range with the break-even bill.
  5. Choose, and write who pays what in the lease.

A worked example

Example (illustrative arithmetic, not market data)

With utilities included the rent is $1,800. With the tenant paying, it is $1,715. The difference is $85 a month, the break-even bill. Your income under each option, with the utility bill running at three levels. Every figure is a made-up round number.

Monthly utility bill Included: $1,800 − bill Tenant pays: $1,715 Included minus tenant pays
$60 $1,740 $1,715 +$25
$85 $1,715 $1,715 $0
$110 $1,690 $1,715 −$25

Including utilities pays when the bill runs under $85 and loses when it runs over. A tenant who runs a lot of water, or a leak you do not know about, moves you from one side to the other. The tenant-pays option fixes your income at $1,715 and moves the variation to the tenant.

The decision is about risk as much as average. If the bills for a unit are steady and low, including them can add income. If they swing, or the unit has an older plumbing system, a fixed rent with the tenant paying is safer (stress test).

Billing rules deserve care. Where several units share a meter, how you split the bill is regulated in many places, and the lease has to say clearly who pays what. Check the local rules before you choose (expenses to count).

Making it routine

  1. Collect a year of bills for each unit.
  2. Compare the range with the break-even bill.
  3. State utilities in the lease plainly.
  4. Review the choice at each renewal.

Run your own numbers

Use the free BRRRR calculator below to see how a utility cost changes a rental’s cash flow.

Quick answers

Which is better for the landlord, utilities included or not?

It depends on the bills. Included utilities are better for the landlord when the bills come in under the amount built into the rent, and worse when they come in over.

How do I find the break-even bill?

Take the difference between the two rents. That is the monthly utility bill at which the two options leave you the same.

Who bears the risk of a high bill?

The landlord when utilities are included. The tenant when they are billed separately.

Are there rules on billing tenants for utilities?

Yes. Rules on submetering, shared meters and disclosure differ by state and city. Check them with a qualified professional.

Do the numbers in this guide apply to my rental?

No. The rents and bills are made up for the example. They are not market data.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.