Estimating Rent With Comps: Use a Range, Not a Hope
The rent figure is the first number in a rental analysis, and it is the one most likely to be too hopeful. Estimating it from comparable rentals, and choosing a cautious figure from the range, keeps the rest of the analysis honest.
How to build the range
- Find several similar nearby rentals: size, bedrooms, bathrooms and condition.
- Prefer recent leases over asking rents.
- Note differences, such as a garage or updated kitchen, and adjust with care.
- Sort the rents and look at the spread, not only the average (estimating ARV with comps uses the same idea for value).
- Choose an underwriting rent toward the lower middle.
A worked example
Example (illustrative arithmetic, not market data)
Assume five comparable rents, in dollars a month. Every figure is a made-up round number.
| Comp | Rent |
|---|---|
| 1 | $1,850 |
| 2 | $1,950 |
| 3 | $2,000 |
| 4 | $2,050 |
| 5 | $2,150 |
The middle rent is $2,000 and the average is also $2,000, with a spread from $1,850 to $2,150. A cautious underwriter might use $1,950, the second-lowest.
Compare the two choices on a property with 5% vacancy and $7,800 of yearly operating costs, as in the earlier guides.
| Item | At $2,000 | At $1,950 |
|---|---|---|
| Gross rent | $24,000 | $23,400 |
| Vacancy, 5% | −$1,200 | −$1,170 |
| Operating costs | −$7,800 | −$7,800 |
| Net operating income | $15,000 | $14,430 |
A $50 lower rent, 2.5% of the rent, lowers net operating income by $570, or 3.8%. Costs did not move, so a small rent change has a larger effect on what is left (DSCR explained).
Keep the process fair
- Set and advertise rent for the unit, not for who might rent it.
- Apply the same screening standards to every applicant.
- Check local rent regulations before setting or raising a rent.
Use the range
- Test the analysis at the low end of the range, not only the middle (rules of thumb).
- Revisit the rent estimate before refinancing (BRRRR refinance).
- Account for the cost of vacancy (tenant turnover cost).
Run your own numbers
Use the free BRRRR calculator below to try different rents on your own property (the BRRRR method).