Verifying a Borrower's Past Projects: The Hour That Pays
A borrower’s track record shapes the terms a lender offers. If it is overstated, the loan is riskier than it looks. An hour of checking public records and references can test it. The question is how often an overstated record has to turn up for the hour to pay.
The steps
- Value the hour spent checking.
- Estimate the extra loss when a record is overstated.
- Break-even chance = value of the hour ÷ extra loss.
- Compare with how often applicants overstate (the underwriting checklist).
A worked example
Example (illustrative arithmetic, not benchmarks)
The check takes 1 hour at $40. An overstated record adds $12,000 of expected loss on a loan. Every figure is a made-up round number.
| Chance a record is overstated | Expected loss avoided (chance × $12,000) | Avoided − $40 |
|---|---|---|
| 0.1% | $12 | −$28 |
| 0.33% | $40 | $0 (break-even) |
| 1% | $120 | +$80 |
| 3% | $360 | +$320 |
The hour pays at a third of a percent chance of an overstated record: $40 ÷ $12,000. Even a rare problem justifies the check.
What matters is what you do with the answer. A record that checks out supports better terms. One that does not changes the loan: lower leverage, more holdback, or no loan. Treat all applicants the same way (personal guarantees).
Making it routine
- Ask for addresses of past projects.
- Check purchase and sale records and speak to references.
- Compute the break-even chance.
- Write down the result in the file.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how a change in leverage changes the loss on a loan.