Walk the Job at the Halfway Point and Write a List
Halfway through the job the schedule has slipped a few days, a finish changed and nobody wrote it down. A walk at the halfway point and a short list afterward takes ten minutes of writing. The question is how likely drift is for the list to pay.
The steps
- Price the list: minutes × the value of your time.
- Price drift: small gaps that grow into delay or rework.
- Break-even chance = list cost ÷ drift cost.
- Keep the weekly rhythm too (a weekly fifteen-minute call with the lead).
A worked example
Example (illustrative arithmetic, not predictions)
The list takes 10 minutes at $60 an hour: $10. Drift costs $500 in delay and rework. Every figure is a made-up round number.
| Chance drift costs money | Expected cost avoided (chance × $500) | Avoided − $10 |
|---|---|---|
| 1% | $5 | −$5 |
| 2% | $10 | $0 (break-even) |
| 6% | $30 | +$20 |
| 10% | $50 | +$40 |
The list pays at a 2% chance of costly drift: $10 ÷ $500. On a multi-week rehab, it is easily exceeded.
Walk the site at about half the schedule, write down what is behind, changed or unclear and send it the same day. Put changes in the contract.
Making it routine
- Walk the site at about half the schedule.
- Write down what is behind, changed or unclear.
- Send the list the same day.
- Put changes in the written contract.
Run your own numbers
Use the free holding cost calculator below to see what each day of drift costs on your own flip.