Write the Assumed Holding Period on the Deal Sheet
The deal sheet assumes a four-month hold, but nobody wrote it down, and the numbers around it assume six. A line on the first line of the sheet with the months takes three minutes. The question is how likely a hidden holding-period assumption is to mislead an offer for the line to pay.
The steps
- Price the line: minutes × the value of your time.
- Price a hidden assumption: an offer built on a holding period nobody checked.
- Break-even chance = line cost ÷ assumption cost.
- Date the inputs too (note the sale date next to every comp).
A worked example
Example (illustrative arithmetic, not predictions)
The line takes 3 minutes at $60 an hour: $3. A hidden assumption misprices an offer by $600. Every figure is a made-up round number.
| Chance a hidden assumption misleads an offer | Expected cost avoided (chance × $600) | Avoided − $3 |
|---|---|---|
| 0.25% | $1.50 | −$1.50 |
| 0.5% | $3 | $0 (break-even) |
| 1.5% | $9 | +$6 |
| 3% | $18 | +$15 |
The line pays at a 0.5% chance of a hidden assumption: $3 ÷ $600. Since carry scales with months, it is easily exceeded.
Write the months on the first line, check the carrying cost uses the same number and ask an experienced contractor whether it is realistic.
Making it routine
- Write the months on the first line.
- Check the carrying cost uses the same number.
- Ask an experienced contractor if it is realistic.
- Change the line when the plan changes.