Write the Comp Search Radius and Date Window Down
The deal sheet lists three comps, all of them the best sales on the street. Nobody wrote down how wide the search was. A line with the radius and the date window takes three minutes. The question is how likely a cherry-picked comp is to mislead an offer for the line to pay.
The steps
- Price the line: minutes × the value of your time.
- Price a cherry-picked comp: an offer based on the best-looking sales rather than the typical ones.
- Break-even chance = line cost ÷ comp cost.
- Estimate value first (how to estimate after-repair value with comps).
A worked example
Example (illustrative arithmetic, not predictions)
The line takes 3 minutes at $60 an hour: $3. A cherry-picked comp misprices an offer by $1,500. Every figure is a made-up round number.
| Chance a cherry-picked comp misleads an offer | Expected cost avoided (chance × $1,500) | Avoided − $3 |
|---|---|---|
| 0.1% | $1.50 | −$1.50 |
| 0.2% | $3 | $0 (break-even) |
| 0.6% | $9 | +$6 |
| 1% | $15 | +$12 |
The line pays at a 0.2% chance of a cherry-picked comp: $3 ÷ $1,500. In a varied neighborhood, it is easily exceeded.
Write the radius and the date window, list all the sales inside them and note why any were dropped.
Making it routine
- Write the radius and the date window.
- List all the sales inside them.
- Note why any were dropped.
- Ask an agent or appraiser about unusual sales.
Run your own numbers
Use the free MAO calculator below to see how a change in after-repair value moves your maximum offer.