Write the LTC and LTV Limits on the Term Sheet

By DeskTech HQ · · 1 min read

A borrower expects a loan of 85% of cost, and the 70% value cap makes it smaller. Neither limit was on the term sheet. Two lines with both limits and the lower of the two take three minutes. The question is how likely limit confusion is for the lines to pay.

The steps

  1. Price the lines: minutes × the value of your time.
  2. Price limit confusion: time and goodwill fixing a loan amount the borrower expected to be higher.
  3. Break-even chance = lines cost ÷ confusion cost.
  4. Know the terms (how to read a fix-and-flip loan term sheet).

A worked example

Example (illustrative arithmetic, not predictions)

The lines take 3 minutes at $60 an hour: $3. Limit confusion costs $300. Every figure is a made-up round number.

Chance of limit confusion Expected cost avoided (chance × $300) Avoided − $3
0.5% $1.50 −$1.50
1% $3 $0 (break-even)
3% $9 +$6
5% $15 +$12

The lines pay at a 1% chance of limit confusion: $3 ÷ $300. Across many applications, it is easily exceeded.

Write both limits with the amounts they allow, say which one controls and check the wording against the loan documents.

Making it routine

  1. Write both limits with the amounts they allow.
  2. Say which one controls.
  3. Check the wording against the loan documents.
  4. Have a lawyer review how limits are described.

Run your own numbers

Use the free fix-and-flip loan sizer below to see both limits at work on your own numbers.

Quick answers

What do you write?

Both limits, the amounts they allow and which one is lower.

How do I price it?

The minutes to add the lines times the value of your time.

What does limit confusion cost?

Time and goodwill fixing a loan amount the borrower expected to be higher.

What is the break-even chance?

The lines' cost divided by that cost.

Do the numbers in this guide apply to my loans?

No. The time, costs and odds are made up for the example. They are not predictions.

Keep reading

Private and hard money lending

LTV, LTC and ARV: How Fix-and-Flip Loans Are Sized

LTV, LTC and ARV caps decide how much a fix-and-flip lender will fund. See the three measures, a worked example and how to find the binding cap.

· 3 min read
Private and hard money lending

Send the Term Sheet as a PDF, Not a Text

Learn how to price sending the borrower the term sheet as a PDF instead of a text message and find the lost-terms chance at which two minutes pays.

· 1 min read
Private and hard money lending

Ask for the Signed Rehab Contract, Not Just the Bid

Learn how to price asking for the signed rehab contract and not just the bid before approving the budget and find the bid-and-contract mismatch chance.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.