Adding a Dishwasher: Payback from the Rent Premium
A dishwasher is a common upgrade. It costs money up front and, if the market pays for it, a bit more rent each month. The payback is how long that takes.
The steps
- Get the all-in cost: the unit, installation and any plumbing or electrical work.
- Estimate the monthly premium comparable units get.
- Payback (months) = cost ÷ monthly premium.
- Compare with how long you expect to hold the unit (appliances new or used).
A worked example
Example (illustrative arithmetic, not market claims)
The cost is $650 installed. The premium is $25 a month. Every figure is a made-up round number.
| Months the unit is rented with a dishwasher | Premium collected (months × $25) | Collected − $650 |
|---|---|---|
| 12 | $300 | −$350 |
| 26 | $650 | $0 (break-even) |
| 36 | $900 | +$250 |
The payback is twenty-six months: $650 ÷ $25. If the dishwasher lasts ten years and stays in the unit, that is a good return. If the premium is only $10, payback is 65 months, and it is not.
The premium is the weak point. Look at comparable listings, with and without a dishwasher, in your area. If the units without one rent as fast and for the same price, the premium is not real, and the return is the faster lease-up at best (your vacancy history).
Making it routine
- Check comparable listings.
- Get the all-in installed cost.
- Compute the payback months.
- Install only when it is under your holding period.
Run your own numbers
Use the free BRRRR calculator below to see how a rent premium changes a rental’s cash flow.