Appliances for a Rental: New or Used, Cost per Year
A used refrigerator costs a fraction of a new one. It also may not last as long. The honest comparison is cost per year of use, and the break-even is how long the used one has to survive.
The steps
- Get the price of the new appliance and the used one, installed.
- Estimate how many years each will last in your rentals, from your own records.
- Divide each price by its life to get cost per year.
- Divide the used price by the new appliance’s cost per year. That is the break-even life for the used one.
- Add repairs and downtime to both (rental capex reserve).
A worked example
Example (illustrative arithmetic, not quotes or standards)
A new refrigerator costs $900 and lasts 12 years: $75 a year. A used one costs $350. Every figure is a made-up round number.
| Years the used one lasts | Used cost per year ($350 ÷ years) | New cost per year | Cheaper |
|---|---|---|---|
| 3 | $117 | $75 | New |
| 4.7 | $75 | $75 | Equal |
| 6 | $58 | $75 | Used |
| Break-even | $350 ÷ $75 = 4.7 years |
The used refrigerator wins if it lasts at least about 4.7 years, which is under 40% of the new one’s life. That is a reasonable bar for many appliances, but the used one carries more risk of an early failure, and a failure in a tenant’s kitchen costs a call, a repair or a replacement at the worst time.
Keep your own record: what each appliance cost, when it went in and when it failed. After a few years that record is a better guide than any rule (rental property expenses to count). Include repairs in the cost per year, and count the days a tenant spends without the appliance, since a long outage can cost goodwill or rent.
Making it routine
- Record the date and cost of every appliance.
- Record when and why each one fails.
- Compute cost per year by model and by new or used.
- Choose by the record, not by the price tag.
Run your own numbers
Use the free BRRRR calculator below to see how a yearly appliance cost changes a rental’s cash flow.