Washer and Dryer Included: Payback from the Rent
Supplying a washer and dryer can raise the rent and speed a lease-up. It also puts a repair bill on the owner. The question is how long the premium takes to repay the cost.
The steps
- Get the cost of a pair, delivered and connected.
- Estimate the monthly premium comparable units get.
- Payback (months) = cost ÷ monthly premium.
- Compare with the pair’s expected life and repair costs (appliances new or used).
A worked example
Example (illustrative arithmetic, not market claims)
A pair costs $1,000 installed. The premium is $40 a month. Every figure is a made-up round number.
| Months rented with the pair | Premium collected (months × $40) | Collected − $1,000 |
|---|---|---|
| 12 | $480 | −$520 |
| 25 | $1,000 | $0 (break-even) |
| 36 | $1,440 | +$440 |
| 60 | $2,400 | +$1,400 |
Payback takes about two years: $1,000 ÷ $40. If the pair lasts ten years, the rest is gain, less repairs. If the premium is only $15, payback runs over five years and the case is weak.
Verify the premium against listings. In a market where most units have hookups only, supplying the machines may be worth the premium. Where most include them, it may only avoid a discount (adding a dishwasher).
Making it routine
- Check comparable listings.
- Put the appliances and repair duties in the lease.
- Compute the payback months.
- Supply them where the payback is inside their life.
Run your own numbers
Use the free BRRRR calculator below to see how a rent premium changes a rental’s cash flow.