Check the Attic for Leak Stains at Turnover: The Odds
A roof leak shows up in the attic long before it stains a ceiling. A flashlight check of the underside of the roof deck takes ten minutes at turnover. The question is how likely an early catch is for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Estimate the extra repair cost an early catch avoids: ceiling, insulation, mold.
- Break-even chance = cost ÷ saving.
- Compare with the age of the roof (roof repair, overlay or replace).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The check takes 10 minutes at $60 an hour: $10. Catching a leak early saves $800. Every figure is a made-up round number.
| Chance the check finds a leak early | Expected saving (chance × $800) | Saving − $10 |
|---|---|---|
| 0.5% | $4 | −$6 |
| 1.25% | $10 | $0 (break-even) |
| 3% | $24 | +$14 |
| 6% | $48 | +$38 |
The check pays at a 1.25% chance of an early catch: $10 ÷ $800. For an older roof, that is likely exceeded.
Look at the underside of the roof deck around chimneys, vents and valleys for dark stains, rust on nails and wet insulation, and look for daylight where there should be none. Stay on the framing, and bring a light and a mask. Photograph anything you find and call a roofer.
Making it routine
- Check the attic at turnover with a light.
- Look around chimneys, vents and valleys.
- Stay on the framing and watch for wiring.
- Photograph findings and call a roofer.
Run your own numbers
Use the free BRRRR calculator below to see how a roof repair found early or late changes a rental’s cash flow.