Exterior Paint: Spot-Prep or Repaint? The Years Bought
Exterior paint is failing in patches. A full repaint costs thousands. A spot-prep costs less and may stretch the paint another year or two. The question is how many years it has to buy to beat repainting now.
The steps
- Cost per year of a repaint = repaint cost ÷ years it lasts.
- Break-even years bought = spot-prep cost ÷ repaint cost per year.
- Ask whether the spot-prep can plausibly buy that long (repair or replace gutters).
A worked example
Example (illustrative arithmetic, not quotes)
A full repaint costs $6,500 and lasts 8 years, $812 a year. A spot-prep costs $900. Every figure is a made-up round number.
| Years the spot-prep buys | Value of the delay (years × $812.50) | Value − $900 |
|---|---|---|
| 0.5 | $406 | −$494 |
| 1.1 | $900 | $0 (break-even) |
| 2 | $1,625 | +$725 |
The spot-prep pays if it buys a little over a year: $900 ÷ $812.50. If it buys two, the whole cycle costs $7,400 over ten years instead of $8,125, a saving of $725.
The catch is that the prep only helps where the surface is sound underneath. Peeling over rotted wood just peels again. And when the painted surface has already failed on most walls, the right choice is the full repaint (driveway crack sealing).
Making it routine
- Walk the exterior each spring and note failing areas.
- Get quotes for the prep and the full repaint.
- Compute the break-even years.
- Follow lead-safe rules on older homes.
Run your own numbers
Use the free BRRRR calculator below to see how a deferred expense changes a rental’s cash flow.