Chimney Scan Before an Offer: The Hidden-Damage Odds

By DeskTech HQ · · 1 min read

The fireplace looks fine from the living room. Inside the flue there may be a cracked liner. A camera scan costs about two hundred dollars. The question is how likely hidden damage is for the scan to pay before you offer.

The steps

  1. Price the scan: the fee.
  2. Estimate the cost of hidden damage found after closing.
  3. Break-even chance = scan fee ÷ damage cost.
  4. Subtract expected repairs in your offer (flood zone insurance cost before you offer shows the same habit for insurance).

A worked example

Example (illustrative arithmetic, not predictions)

The scan costs $200. Hidden damage found after closing would cost $5,000 to repair. Every figure is a made-up round number.

Chance of hidden flue damage Expected cost avoided (chance × $5,000) Avoided − $200
2% $100 −$100
4% $200 $0 (break-even)
8% $400 +$200
12% $600 +$400

The scan pays at a 4% chance of hidden damage: $200 ÷ $5,000. In an older house with a wood-burning fireplace, that is plausible.

Ask for a scan by a qualified chimney professional in your inspection period, and get the findings in writing. If the flue is damaged, either price the repair into your offer or treat the fireplace as not usable.

Making it routine

  1. Ask for the scan in the inspection period.
  2. Use a qualified chimney professional.
  3. Get the findings in writing.
  4. Price the repair or treat the fireplace as unusable.

Run your own numbers

Use the free MAO calculator below to see how a relining changes the most you can offer.

Quick answers

What does a chimney scan show?

A camera inspection of the flue for cracks, blockages and creosote.

How do I price it?

The fee for the scan.

What does hidden damage cost?

A relining or rebuild you did not budget.

What is the break-even chance?

The scan fee divided by the hidden-damage cost.

Do the numbers in this guide apply to my deal?

No. The fee, cost and odds are made up for the example. They are not predictions.

Keep reading

Deal analysis

Ask About a Solar Lease Before an Offer: The Odds

Learn how to price a ten-minute check for a solar panel lease or financing lien on a roof before you offer and find the chance it exists that makes it pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.