Ask How Long the House Has Been Vacant Before an Offer
The listing photos are clean. The house has stood empty through two winters. A five-minute email asks how long it has been vacant and whether the heat stayed on. The question is how likely vacancy damage is for the email to pay before you offer.
The steps
- Price the email: minutes × the value of your time.
- Price vacancy damage: a repair you did not budget.
- Break-even chance = email cost ÷ damage cost.
- Ask why they are selling too (ask the seller why they are selling).
A worked example
Example (illustrative arithmetic, not predictions)
The email takes 5 minutes at $60 an hour: $5. Vacancy damage would cost $1,000 to repair. Every figure is a made-up round number.
| Chance of vacancy damage | Expected cost avoided (chance × $1,000) | Avoided − $5 |
|---|---|---|
| 0.25% | $2.50 | −$2.50 |
| 0.5% | $5 | $0 (break-even) |
| 1.5% | $15 | +$10 |
| 3% | $30 | +$25 |
The email pays at a 0.5% chance of vacancy damage: $5 ÷ $1,000. On a house that has stood empty for a winter, it is easily exceeded.
Ask how long it has been vacant, whether the heat and water were on, and when it was last visited. Keep the answer and rely on your own inspection.
Making it routine
- Ask how long it has been vacant.
- Ask whether heat and water were on.
- Ask when it was last visited.
- Rely on your own inspection.
Run your own numbers
Use the free MAO calculator below to see how a hidden repair changes the most you can offer.