Ask for Every Garage Remote, Key and Code in Writing

By DeskTech HQ · · 1 min read

At closing the seller hands over one key and says “the rest are around”. The garage remotes are gone and the alarm code was never written down. A written list in the contract takes four minutes to add. The question is how likely a missing item is for the request to pay.

The steps

  1. Price the request: minutes × the value of your time.
  2. Price a missing item: a rekey, a new remote or a reset.
  3. Break-even chance = request cost ÷ missing-item cost.
  4. Rekey and log keys too (keep a key log for every flip).

A worked example

Example (illustrative arithmetic, not predictions)

The request takes 4 minutes at $60 an hour: $4. A missing item costs $200 to replace or reset. Every figure is a made-up round number.

Chance of a missing item Expected cost avoided (chance × $200) Avoided − $4
1% $2 −$2
2% $4 $0 (break-even)
4% $8 +$4
8% $16 +$12

The request pays at a 2% chance of a missing item: $4 ÷ $200. On a house with an old opener and several doors, it is plausible.

List keys, remotes, codes and logins in the contract with your agent or lawyer, check them at the final walk-through and change every code after closing. Rekey the locks.

Making it routine

  1. List keys, remotes, codes and logins in the contract.
  2. Check them at the final walk-through.
  3. Change every code after closing.
  4. Rekey the locks.

Run your own numbers

Use the free MAO calculator below to see how small closing costs change the most you can offer.

Quick answers

What do you ask for?

All keys, garage remotes, lockbox and alarm codes and any shared logins.

How do I price the request?

The minutes times the value of your time.

What does a missing item cost?

A rekey, a new remote or a new opener setting.

What is the break-even chance?

The request's cost divided by that cost.

Do the numbers in this guide apply to my deal?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Deal analysis

Ask About a Solar Lease Before an Offer: The Odds

Learn how to price a ten-minute check for a solar panel lease or financing lien on a roof before you offer and find the chance it exists that makes it pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.