Ask for the Draw Inspector's Insurance Before Hiring

By DeskTech HQ · · 1 min read

A draw inspector approves a draw for work that was not done, and the money is gone. If the inspector has no cover and no assets, there is nothing to recover. Asking for a certificate before hiring takes five minutes. The question is how likely an uninsured inspector’s mistake is for the check to pay.

The steps

  1. Price the check: minutes × the value of your time.
  2. Estimate the loss from a mistake you cannot recover.
  3. Break-even chance = check cost ÷ unrecoverable loss.
  4. Pair it with your own cover (errors and omissions cover for a small lender).

A worked example

Example (illustrative arithmetic, not predictions)

The check takes 5 minutes at $60 an hour: $5. An unrecoverable inspector mistake would cost $2,000. Every figure is a made-up round number.

Chance of an uninsured inspector’s costly mistake Expected loss avoided (chance × $2,000) Avoided − $5
0.1% $2 −$3
0.25% $5 $0 (break-even)
1% $20 +$15
3% $60 +$55

The check pays at a 0.25% chance of a costly uninsured mistake: $5 ÷ $2,000. Over many draws, that is plausible.

Ask for a certificate that shows the cover, the limits and the dates, and ask who is named. Read the engagement terms for limits on the inspector’s liability. Cover reduces the risk, but it does not guarantee a claim will be paid, so keep your own inspection standards.

Making it routine

  1. Ask for a certificate of insurance before hiring.
  2. Check the cover, limits and dates.
  3. Read the engagement terms for liability limits.
  4. Keep your own inspection standards.

Run your own numbers

Use the free fix-and-flip loan sizer below to see the amount at risk on a draw approved in error.

Quick answers

What cover should an inspector carry?

Often general liability and, for professionals, errors and omissions cover.

How do I price the check?

The minutes times the value of your time.

What does an uninsured inspector cost?

A claim you cannot recover from a person without cover.

What is the break-even chance?

The check's cost divided by that cost.

Do the numbers in this guide apply to my draws?

No. The time, cost and odds are made up for the example. They are not predictions.

Keep reading

Draw management

Same Inspector for Every Draw on a Job: The Odds

Learn how to price asking for the same inspector at every draw on a job and find the chance of a missed carry-over issue at which the five minutes pays.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.