Same Inspector for Every Draw on a Job: The Odds
A new inspector at every draw starts from scratch. An old problem noted in the first visit can slip past the third. Asking for the same inspector costs a few minutes of scheduling. The question is how likely a missed carry-over issue is for it to pay.
The steps
- Price the scheduling: minutes × the value of your time.
- Estimate the cost of a missed carry-over issue: paying for unfixed work.
- Break-even chance = scheduling cost ÷ issue cost.
- Compare with how often issues carried over between draws (draw inspections: cost vs overpayment saved).
A worked example
Example (illustrative arithmetic, not predictions)
The scheduling takes 5 minutes at $60 an hour: $5. A missed carry-over issue would cost $1,000. Every figure is a made-up round number.
| Chance a carry-over issue is missed by a new inspector | Expected cost avoided (chance × $1,000) | Avoided − $5 |
|---|---|---|
| 0.25% | $2.50 | −$2.50 |
| 0.5% | $5.00 | $0 (break-even) |
| 2% | $20.00 | +$15.00 |
| 5% | $50.00 | +$45.00 |
The same inspector pays at a 0.5% chance of a missed issue: $5 ÷ $1,000. On a long rehab with several draws, that is likely exceeded.
If you cannot keep the same inspector, send the new one the earlier reports and a list of open items. Ask each inspector to note open items in a standard way so the next visit can check them.
Making it routine
- Ask for the same inspector at each draw.
- Send earlier reports if it changes.
- Keep a list of open items.
- Ask each inspector to note them the same way.