Ask for Materials and Labor Split on Each Draw Line

By DeskTech HQ · · 1 min read

A line says “kitchen cabinets $9,000”. Nobody can tell whether the cabinets are bought, delivered or installed. Asking for materials and labor on each line takes three minutes. The question is how likely overbilling is for the ask to pay.

The steps

  1. Price the ask: minutes × the value of your time.
  2. Price overbilling: money paid ahead of the work or materials.
  3. Break-even chance = ask cost ÷ overbilling cost.
  4. Pair it with receipts (material receipts with each draw).

A worked example

Example (illustrative arithmetic, not predictions)

The ask takes 3 minutes at $60 an hour: $3. Overbilling costs $150 to recover. Every figure is a made-up round number.

Chance of overbilling on a line Expected cost avoided (chance × $150) Avoided − $3
1% $1.50 −$1.50
2% $3 $0 (break-even)
5% $7.50 +$4.50
10% $15 +$12

The ask pays at a 2% chance of overbilling on a line: $3 ÷ $150. Across many lines and draws, it is plausible.

Ask for materials and labor on each line of the draw request, compare the materials to receipts and the labor to what you see on site, and put the requirement in the draw agreement. Verify the work before paying.

Making it routine

  1. Ask for materials and labor on each line.
  2. Compare materials to receipts.
  3. Compare labor to what you see on site.
  4. Put the requirement in the draw agreement.

Run your own numbers

Use the free fix-and-flip loan sizer below to see how draws and interest add up on a rehab loan.

Quick answers

What does the split show?

How much of each line is materials and how much is labor.

How do I price the ask?

The minutes to explain it times the value of your time.

What does overbilling cost?

Money paid for work or materials not yet in place.

What is the break-even chance?

The ask's cost divided by the overbilling cost.

Do the numbers in this guide apply to my draws?

No. The time, costs and odds are made up for the example. They are not predictions.

Keep reading

Draw management

Material Receipts With Each Draw: The Odds

Learn how to price a five-minute check of material receipts attached to a draw request and find the overbilling chance that makes it pay.

· 1 min read
Draw management

Number Each Contractor Draw Invoice in Sequence

Learn how to price asking the contractor to number each draw invoice in sequence and find the duplicate-invoice chance at which two minutes pays.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.