Ask for Materials and Labor Split on Each Draw Line
A line says “kitchen cabinets $9,000”. Nobody can tell whether the cabinets are bought, delivered or installed. Asking for materials and labor on each line takes three minutes. The question is how likely overbilling is for the ask to pay.
The steps
- Price the ask: minutes × the value of your time.
- Price overbilling: money paid ahead of the work or materials.
- Break-even chance = ask cost ÷ overbilling cost.
- Pair it with receipts (material receipts with each draw).
A worked example
Example (illustrative arithmetic, not predictions)
The ask takes 3 minutes at $60 an hour: $3. Overbilling costs $150 to recover. Every figure is a made-up round number.
| Chance of overbilling on a line | Expected cost avoided (chance × $150) | Avoided − $3 |
|---|---|---|
| 1% | $1.50 | −$1.50 |
| 2% | $3 | $0 (break-even) |
| 5% | $7.50 | +$4.50 |
| 10% | $15 | +$12 |
The ask pays at a 2% chance of overbilling on a line: $3 ÷ $150. Across many lines and draws, it is plausible.
Ask for materials and labor on each line of the draw request, compare the materials to receipts and the labor to what you see on site, and put the requirement in the draw agreement. Verify the work before paying.
Making it routine
- Ask for materials and labor on each line.
- Compare materials to receipts.
- Compare labor to what you see on site.
- Put the requirement in the draw agreement.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how draws and interest add up on a rehab loan.