Ask the Contractor to List Materials Delivered on Each Draw
A draw request bills for cabinets that are not on site yet. The invoice is real; the delivery is not. A short list of what was delivered and when, checked against photos, takes three minutes per draw. The question is how likely a paid-for-nothing bill is for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Price paid-for-nothing: paying for materials that were billed and never arrived.
- Break-even chance = check cost ÷ bill cost.
- Split materials and labor too (split materials and labor on each draw line).
A worked example
Example (illustrative arithmetic, not predictions)
The check takes 3 minutes at $60 an hour: $3. A paid-for-nothing bill costs $300. Every figure is a made-up round number.
| Chance of a paid-for-nothing bill | Expected cost avoided (chance × $300) | Avoided − $3 |
|---|---|---|
| 0.5% | $1.50 | −$1.50 |
| 1% | $3 | $0 (break-even) |
| 3% | $9 | +$6 |
| 5% | $15 | +$12 |
The check pays at a 1% chance of a paid-for-nothing bill: $3 ÷ $300. Over many draws, it is easily exceeded.
Ask for the list on each request, match it to the photos and delivery slips and ask about any item that is billed but not delivered.
Making it routine
- Ask for the delivered-materials list on each request.
- Match it to photos and delivery slips.
- Ask about items billed but not delivered.
- Keep the list with the draw record.