Material Receipts With Each Draw: The Odds
A draw request lists materials. A receipt shows what was bought. Matching them takes five minutes. The question is how likely a draw is to be overbilled for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Estimate the overbilling a receipt would catch: the dollars claimed beyond what was bought.
- Break-even chance = cost ÷ overbilling.
- Use it with the inspection (draw inspections: cost vs overpayment saved).
A worked example
Example (illustrative arithmetic, not predictions)
The check takes 5 minutes at $60 an hour: $5. Overbilling on a draw would be $400. Every figure is a made-up round number.
| Chance a draw is overbilled | Expected overbilling avoided (chance × $400) | Avoided − $5 |
|---|---|---|
| 0.5% | $2 | −$3 |
| 1.25% | $5 | $0 (break-even) |
| 3% | $12 | +$7 |
| 5% | $20 | +$15 |
The check pays at a 1.25% chance of overbilling: $5 ÷ $400. A lender who has seen even one inflated materials line has seen more than that.
It takes a minute to see that a receipt’s date, quantity and total match the line. Large or round numbers with no receipt deserve a question. The check does not accuse anyone; it asks for the paper (how many draw photos).
Making it routine
- Ask for receipts in the contract before work starts.
- Match each materials line to a receipt.
- Ask for missing paper before paying.
- Log the lines that did not match.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how an overpaid draw changes the funds left for the rest of a rehab.