Ask the Seller to Leave the Utilities On for the Inspection
The inspector arrives at a vacant house and the water is off. Half the inspection cannot be done. A five-minute email to the seller’s agent asks for the utilities to be left on. The question is how likely a re-inspection is for the email to pay.
The steps
- Price the email: minutes × the value of your time.
- Price a re-inspection: a second fee and a delay.
- Break-even chance = email cost ÷ re-inspection cost.
- Read the disclosure too (read the seller’s disclosure form for the unknowns).
A worked example
Example (illustrative arithmetic, not predictions)
The email takes 5 minutes at $60 an hour: $5. A re-inspection costs $125 in fees and delay. Every figure is a made-up round number.
| Chance of a re-inspection | Expected cost avoided (chance × $125) | Avoided − $5 |
|---|---|---|
| 2% | $2.50 | −$2.50 |
| 4% | $5 | $0 (break-even) |
| 8% | $10 | +$5 |
| 12% | $15 | +$10 |
The email pays at a 4% chance of a re-inspection: $5 ÷ $125. For a vacant house, it is easily exceeded.
Ask in writing, at the time of the offer, for water, power and gas to be on and the pilot lit by a qualified person, and confirm the day before. Make the request part of the contract where you can.
Making it routine
- Ask in writing at the time of the offer.
- Ask for water, power and gas to be on.
- Have a qualified person light pilots.
- Confirm the day before.
Run your own numbers
Use the free MAO calculator below to see how a second inspection fee changes the most you can offer.